Turnpike lanes close nightly between U.S. 192 and Osceola Parkway through Thursday. Plus S.R. 429 at U.S. 192, U.S. 192 repaving and county closures.

Last checked 2026-11-10 (Nov. 10, 2026). This page is refreshed weekly. Sources: FDOT District 5’s CFLRoads projects for Kissimmee and Osceola County lane closures, Florida’s Turnpike Enterprise’s weekly lane closure advisory for Nov. 8-13, FDOT’s statewide work zone feed as shown on FL511, Osceola County’s news releases, and the City of Kissimmee’s news and Citywide Road Resurfacing page.

Three agencies own the roads in Kissimmee. The Florida Department of Transportation (FDOT) runs the big state highways and Florida’s Turnpike, Osceola County runs several major roads inside city limits, and the city runs the rest. The closure to plan around this week is the Turnpike between U.S. 192 and Osceola Parkway, down to one lane each way overnight through Thursday, Nov. 12. S.R. 429 at U.S. 192 near Celebration has night lane closures through Thursday too. FDOT’s repaving of U.S. 192 east of downtown is in construction, with no lane closures posted yet.

Who to call

  • Live traffic, state roads and interstates: dial 511 or go to FL511.com
  • City streets (potholes, markings, resurfacing): Public Works and Engineering, 407-518-2170, or report a pothole
  • U.S. 192 projects (FDOT): Annabelle Bruzos Vega, 321-319-8130
  • Florida’s Turnpike: 1-800-749-7453 (PIKE)
  • County roads: Osceola County

Who owns which road

From the city’s resurfacing page:

Owner Roads inside Kissimmee city limits
State (FDOT) John Young Parkway, Orange Blossom Trail, Vine Street (U.S. 192)
Osceola County Hoagland Boulevard, Osceola Parkway, Michigan Avenue, Carroll Street east of John Young Parkway
City of Kissimmee Other streets inside city limits

Report problems to the owner. A Kissimmee address outside city limits is a county road matter; check with the city’s city limits lookup.

State projects under way

U.S. 192 from Main Street to Aeronautical Drive (FDOT project 450778-1)

  • What: resurfacing 3.8 miles of East Vine Street and East Irlo Bronson Memorial Highway, rebuilding curb ramps and crosswalks, and adding a through/left lane on the westbound Florida’s Turnpike access road at Cross Prairie Parkway.
  • When: FDOT lists the start as fall 2026 and estimated completion as spring 2027. Contractor: Hubbard Construction. Cost: $7.4 million.
  • Lane closures: none listed on Nov. 10. FDOT posts them on the project page and the Osceola County lane closure list, which also showed no closures in the county on Nov. 10.

Florida’s Turnpike widening, Partin Settlement Road to Osceola Parkway

Florida’s Turnpike Enterprise is widening the Turnpike from two to four lanes each way, with interchange work at Osceola Parkway (Exit 249). Its advisory for Nov. 8-13 lists, for the rest of this week:

  • Northbound between the Kissimmee/St. Cloud exit and Osceola Parkway (Exit 249): one lane closed overnight, 7:30 p.m. to 5:30 a.m., nightly through Thursday night, Nov. 12; shoulder closures 7 a.m. to 5 p.m. daily through Friday, Nov. 13.
  • Southbound between Osceola Parkway and the Kissimmee/St. Cloud exit: one lane closed overnight, 8 p.m. to 6 a.m., nightly through Thursday night, Nov. 12; shoulder closures 7 a.m. to 5 p.m. daily through Friday, Nov. 13.

The overnight closure of the southbound exit ramp to U.S. 192 and a northbound lane closure at Neptune Road were both set for Monday night, Nov. 9, only. The Neptune Road bridge replacement runs through late 2027. FL511 showed a lane blocked in each direction near mile markers 244 and 245 on Monday night.

The widening runs through early 2031 and costs about $345 million, the Turnpike says.

Florida’s Turnpike widening, Clay Whaley Road to U.S. 192, and the new Nolte Road interchange

South of the U.S. 192 exit, the Turnpike is widening the road between Clay Whaley Road (formerly Kissimmee Park Road) and U.S. 192, mileposts 239 to 242, and building a new interchange at W. Nolte Road. This week:

  • Both directions: one lane closed overnight, 9 p.m. to 6 a.m., nightly through Wednesday night, Nov. 11; shoulder closures 7 a.m. to 5 p.m. daily through Friday, Nov. 13.

That project runs through early 2029 and costs about $193 million, the Turnpike says.

S.R. 429 at U.S. 192 (Exit 6)

Florida’s Turnpike Enterprise is lengthening the southbound S.R. 429 exit ramp to U.S. 192 and adding three right-turn and two left-turn lanes where it meets U.S. 192, near Celebration, which is about eight miles west of Kissimmee. Work runs through late 2026. This week, 9 p.m. to 6:30 a.m. nightly through Thursday night, Nov. 12:

  • Southbound S.R. 429 north to south of the U.S. 192 exit: one lane closed overnight.
  • Southbound S.R. 429 exit ramp to U.S. 192: one lane closed overnight.
  • U.S. 192 (Irlo Bronson Memorial Highway), both directions, under S.R. 429: one lane closed overnight.

State projects just finished

U.S. 192 from Bamboo Lane to Main Street (FDOT project 448783-1). FDOT now lists the $26 million job as complete. It repaved and restriped 5.7 miles of West Irlo Bronson Memorial Highway and West Vine Street, with 11-foot travel lanes, 7-foot buffered bike lanes, and new signalized crosswalks with pedestrian hybrid beacons at Oren Brown Road, Interior Street and south of Four Winds Boulevard.

State projects coming next

Project What and when
U.S. 441 at Donegan Avenue New signal heads, rebuilt corners and sidewalks, more time for people on foot to cross. $1.3 million estimated; letting Jan. 27, 2027
U.S. 441 from north of Old Dixie Highway to Mary Louis Lane Repave North Orange Blossom Trail and replace curb ramps. 2.5 miles; $8.7 million estimated; letting Jan. 27, 2027
John Young Parkway at Pleasant Hill Road A bypass road through the southeast quadrant and new overpass lanes for northbound U.S. 17-92. $76.2 million estimated; FDOT says right-of-way buying starts in late 2026; letting April 26, 2028

A “letting” is when FDOT opens bids; construction follows months later.

Next week

Florida’s Turnpike Enterprise posts its lane closure advisory for the week ahead on Fridays. The one for Nov. 15-20 was not out on Nov. 10, so Turnpike and S.R. 429 closures for next week are not confirmed yet. FDOT’s work zone feed already lists more Turnpike widening work for the week of Nov. 15 without giving times. We will add them when the advisory is posted.

County and local work zones

These are listed in FDOT’s statewide work zone feed, as last read on Nov. 10. The feed does not always name the agency doing the work; check FL511 before you go.

Buenaventura Lakes (about five miles north):

  • North Trotters Circle at Buenaventura Boulevard: closed, listed through today, Tuesday, Nov. 10. We could not confirm whether it reopens on time. Local traffic uses South Trotters Circle to reach Buenaventura Boulevard. Questions: 407-218-6537 or Buenaventura_Boulevard@qcausa.com.
  • Simpson Road at Royal Palm Drive: listed as a full road closure through Dec. 22. We could not find a posted detour.
  • Buenaventura Boulevard between Florida Parkway and the southern Trotters Circle: the one-lane-each-way traffic shift we listed on Oct. 28 (then shown through Dec. 31) no longer appears in the feed. We could not confirm whether it has ended.

Kissimmee Park Road: listed as closed from Oct. 12 through Feb. 26, 2027. The listing tells drivers to follow posted detour signs through Cross Prairie Parkway and use the newly built road segment. It does not give the closure’s exact limits. Questions: Cameron Hindle, chindle@hansonwalter.com.

County projects finished in October

Simpson Road North is now a divided four-lane road from Marisol Loop and Winners Circle to Myers Road, along the east side of Buenaventura Lakes. Osceola County opened it Oct. 12, 241 days early, at a cost of $73.2 million. It has six new signals and a 10-foot path on each side. Read our story or the county’s announcement.

South Poinciana Boulevard in Poinciana is now four lanes for about 5.7 miles from Trafalgar Boulevard to Pleasant Hill Road. Osceola County cut the ribbon Tuesday, Oct. 13, on the $82 million widening. It added turn lanes, a median, upgraded signals and lighting, and a multimodal trail. The county said peak travel times on the stretch fell more than 32%, citing INRIX data. Read the county’s announcement or the project page.

City resurfacing

The city’s citywide program mills off the top layer of old asphalt, lays a new base and repaves. The city says:

  • Work runs through the year, mostly 7 a.m. to 5 p.m. Monday through Friday.
  • Expect lane shifts, lane and road closures, detours and flaggers.
  • Some streets are timed around Toho Water Authority pipe work.
  • Emergency vehicles always get through; driveway access may be briefly limited.

The streets on this year’s list are on the city’s resurfacing map (PDF, dated July 2025).

What this means for you

  • Using the Turnpike at night between U.S. 192 and Osceola Parkway? Expect one lane each way from 7:30 or 8 p.m. through Thursday night.
  • South of U.S. 192 toward Clay Whaley Road, the night lane closures end after Wednesday night.
  • Driving U.S. 192 near S.R. 429 after 9 p.m. through Thursday? Expect one lane each way under the overpass.
  • Driving U.S. 192 east of Main Street? Expect lane closures as FDOT’s resurfacing gets going; they will be posted on the project page first.
  • The new pedestrian signals at Interior Street and near Four Winds Boulevard on U.S. 192 west are in use.
  • Use the new hybrid beacons as designed: a solid red means stop and stay stopped while people cross. FDOT has a how-to sheet.
  • Check 511 before you head for I-4 or the Turnpike.

Related: getting around Kissimmee, who to call at City Hall and moving to Kissimmee.

Frequently asked questions

What is the construction on U.S. 192 in Kissimmee?

FDOT is starting a $7.4 million job to resurface 3.8 miles of U.S. 192 from Main Street to Aeronautical Drive, with new curb ramps and crosswalks. FDOT lists the start as fall 2026 and the finish as spring 2027. The earlier repaving west of Main Street, from Bamboo Lane, is complete.

Who fixes potholes in Kissimmee?

The city fixes city streets; report them on the city’s pothole page or call Public Works at 407-518-2170. John Young Parkway, Orange Blossom Trail and Vine Street (U.S. 192) belong to FDOT, and Hoagland Boulevard, Osceola Parkway, Michigan Avenue and Carroll Street east of John Young Parkway belong to Osceola County.

Are there Turnpike lane closures near Kissimmee this week?

Yes. Florida’s Turnpike Enterprise is closing one lane each way overnight between the Kissimmee/St. Cloud exit (U.S. 192/U.S. 441) and Osceola Parkway (Exit 249) through Thursday night, Nov. 12, and one lane each way between Clay Whaley Road and U.S. 192 through Wednesday night, Nov. 11. The overnight closure of the southbound exit ramp to U.S. 192 was set for Monday night, Nov. 9, only.

How do I check traffic and road closures in Kissimmee?

Dial 511 or use FL511.com for state highways and interstates, and check FDOT District 5’s CFLRoads lane closure list for Osceola County.

When does the city resurface streets in Kissimmee?

The city’s resurfacing program runs through the year, mainly 7 a.m. to 5 p.m. Monday through Friday, with lane shifts, closures and flaggers in work zones.